KATOWICE-GISZOWIEC, Górniczego Stanu 130
A developed land property located in peripheral zone at the distances of 1200m from inhabited terrains of Giszowiec district
The property is surrounded by a forset; access by means of paved road in the forset (apprx. 500m).
Land partly hardened- asphalt pavement.
The plots includes two identical one-storey buildings, which require major repair.
Suggested land development: retention of current warehouse and production function based on the existing infrastructure, possibility of extension or adaption for service designation (office and hotel function).
Distances:
- national road no. 86 – 2 km
- A4 motorway – 3,5 km
- Katowice centre – 5 minutes drive
Plot area– 7.306 sqm
Development – 2 buildings of total usable area of 928,76 sqm (2 x 464,38 sqm) |